Journal of East China Normal University(Natural Sc ›› 2009, Vol. 2009 ›› Issue (3): 136-145.
• Article • Previous Articles Next Articles
HUANG Huiming,WANG Yigang,LI Qi
Received:
Revised:
Online:
Published:
Abstract: Reclamations in a hilly, fluvial and macrotidal estuary will narrow flood channels. Consequently, it may reduce the safety and stability of hydraulic structures downstream. For this, the paper calculated the maximum scour depth of piers of Yundan Bridge in Fujian province through a 2D numerical model, the semiempire and semitheory formulae about general scour and localized scour. The results indicate that, during flooding period, the scour depth of piers of Yudang Bridge is comparatively serious; so it is necessary to take protecting measures for piers. In addition, influence factors about the maximum scour depth of bridge piers are discussed, and then the conclusion is put forward that actual scour depth of piers hardly reach the calculated amount.
Key words: fluvial and macrotidal estuary, reclamation, general scour, localized scour, hilly, fluvial and macrotidal estuary, reclamation, general scour, localized scour
CLC Number:
Q948
HUANG Huiming;WANG Yigang;LI Qi. Study on the maximum scour depth of piers of a bridge afterreclamation in a hilly, fluvial and macrotidal estuary[J]. Journal of East China Normal University(Natural Sc, 2009, 2009(3): 136-145.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://xblk.ecnu.edu.cn/EN/
https://xblk.ecnu.edu.cn/EN/Y2009/V2009/I3/136